在黑龙江酒店晚上怎么叫服务

Welcome to this station on Friday, October 16, 2020 Bengbu tuojian electromechanical Co., Ltd website:  3eggstudios.com

Company news

How to install air cooler

written words: [big] [middle] [small] 2016 / 10 / 12 Views: two thousand five hundred and forty-five     

Tuojian mechanical and Electrical Co., Ltd. is a comprehensive enterprise integrating production, sales and wholesale. Today, we will explain to you what preparation work should be done in the process of installation of the air cooler we ordered?

We should make a good construction plan, prepare various construction tools and equipment, as well as materials needed for the project, waiting for the arrival of the air cooler. When the equipment arrives at the company, we should first check whether the air cooler delivered to the company is the model we ordered, and then unload it after confirmation. Here we want to emphasize that there is no need for professional personnel to be present when the air cooler is unpacked for acceptance, because what we want to see is not only the appearance of the air cooler, but also its performance.

(1) after unpacking, the first thing is to find the factory certificate of our air cooler, the packing list of the equipment, and the manufacturing, assembly and quality inspection certificates of the parts related to important parts provided by the manufacturer;

(2) the installation drawing, general assembly drawing and installation and operation manual of the air cooler shall be checked, and the name, model and specification of the equipment shall be checked, and its parts and special tools shall be counted according to the contents of the packing list, and the appearance of the equipment shall be carefully inspected; the customer representative, supervisor, manufacturer and other units shall be present for the unpacking acceptance, and the unpacking record shall be approved Adjust the installation and inspection of the motor, adjust the installation distance of the motor, adjust the installation distance of the fan cover, and adjust the installation of the fan cover.

More questions about the arrival of air cooler

          For details, please call   13865084588  Manager Huang

Back to the previous step
Print this page
[up]

Home page

Product Center

Customer case

Entering tuojian

Information trends

Online inquiry

contact us

Online Service

Sales consulting

Hotline:
thirteen billion eight hundred and sixty-five million eighty-four thousand five hundred and eighty-eight

Please scan the QR code
Open mobile phone station

var _ hmt = _ hmt || []; (function() { var hm = document.createElement("script"); hm.src = "http://hm.baidu.com/hm.js?a9bae98a10f869205bf21cadbe440265"; var s = document.getElementsByTagName("script")[0]; s.parentNode.insertBefore(hm, s); })();